90% Storage Boost with FIFO Pushback Rack for Xtra Heavy Loads
Custom engineered 4-deep push-back racking supports 3,000-pound loads while delivering a 90% boost in storage density over standard selective layouts.
Project Summary
Industry Operation
Metal manufacturing and distribution
Key Technologies
Pushback Racking System - Moving the product from floor storage to double stacked loads on two levels of racking with 3 and 4 deep push backs
Success Impact
90% Increase in Storage Density - 3,000 lb. Capacity per Pallet Position - 4-Deep High-Density Configuration - Zero Additional Square Footage Required - 30% Improvement in Overall Facility Capacity
Organized by design, not by accident.
In the manufacturing world, storage solutions are as unique as the items being stored. Factor in all the moving parts of a functioning warehouse and it’s like a macrocosm of a living organism. When organized correctly, parts and people move in and out and everything works in harmony.
This does not happen by accident. Planning and design come together to accommodate every specific need.
Challenge: Engineering for 4,000-pound extremes.
Some needs are less common than others. For example, one of our metal manufacturing clients we partner with uses a powdered metal that has very unique storage needs.
The imported powder ships in super-sized sacks stacked on pallets. While this seems standard enough, this particular powdered metal has 2 uncommon qualities.
- It’s heavy –
“Unusually heavy,” said Ivar Lonon, AEC Conveyor and Material Handling Specialist. “Most heavy loads are 1,500 to 2,000 pounds. This was 4,000 pound sacks, stacked on pallets two high, on the floor.”
- The powder cannot get wet because of a chemical reaction it has with water. This means the room in which it is stored must be clear of all potential liquid contamination including a sprinkler system.
To accommodate this need, they had cleared a space dedicated to this product—not necessarily an easy task to create a sprinkler-free zone within a large and busy complex. Although the space worked at first, increasing demand meant increased quantities of the powdered metal. Soon there was not enough room to efficiently manage storage and keep up with first in first out (FIFO).
Solution: Push-Back to move forward.
We were called in to provide a solution. The temporary fix of floor stacking had to change. Because this system didn’t allow for FIFO, our client was forced to constantly move one 4,000-pound stack of product to get to another.
To maximize efficiency, we installed a heavy duty push back rack system. “Our client needed a solution fast. Without a lot of room to work with I knew the push back system would be the perfect fit for their need,” said Lonon.
Pushback racking systems allow forklifts to load a pallet, then load a second pallet (or more) from the aisle, pushing the first pallet back. This works by means of a nested rolling cart riding on inclined rails installed on the racking system.
When a pallet is removed, those behind it shift forward to become flush with the aisle making it easy for the forklift to access and remove them.
Result: Boosting storage density by 90% while mastering FIFO flow.
In a small space, pushback rack also removes the need for multiple aisles. Removing the extra space that a forklift would need to access each load on selective racking increases product storage up to 90% – depending upon the warehouse.
Delivering speed, safety, and total client satisfaction.
For our client, the solution allowed for double stacked loads on 2 levels of racks, 3 pushbacks deep on one side of the room, and the same but 4 deep on the other.
“The new system means no more moving product around just to get to product. Now they can get in and get what they need quicker and safer,” said Lonon.
Our client is extremely satisfied with the results. They can now get all the needed product stored in the designated area with far simpler FIFO inventory control.
See the system in action!
Let’s solve your challenge.
Since 1960, we’ve helped our clients solve complex challenges with smart, productivity-driven solutions in automation, material handling, and storage.
Tell us a bit about your project. Our team will follow up within 2 business days to explore how we can help you move faster, operate smarter, and get measurable results.